Review and design
The process starts with goals, usage information, preliminary roof evaluation and a system proposal. A site survey can confirm measurements and electrical details.
Agreement, permits and utility coordination
After project documents are completed, the company coordinates applicable permits, utility interconnection and required approvals. These steps can affect the schedule.
Installation and permission to operate
Installation is followed by inspections and utility requirements. A grid-connected system should be operated according to project approvals and utility instructions. Ask who communicates progress at every stage.